Placing Orders on an Exchange: Maker and Taker
Buying crypto with USDT on an exchange: a market order fills right away but costs more in fees and may slip; a limit order is cheaper but might not fill.
Risk warning: forex, CFDs, options, futures and crypto assets usually involve leverage or high volatility, and you can lose more than you put in. This lesson only teaches the concepts; all numbers are for illustration and are not investment advice.
Every lesson has an interactive simulation you can drag and play, plus a quick quiz. Sign up free to use them and save your progress automatically. Here is the text version of this lesson.
Not sure yet? Try the first lesson (no sign-up needed)「Blockchains and Cryptocurrency」。
Text version · Crypto Basics, lesson 7: “Placing Orders on an Exchange: Maker and Taker”
Buying crypto with USDT on an exchange: a market order fills right away but costs more in fees and may slip; a limit order is cheaper but might not fill.
Trading pairs: coins priced in USDT
The trading pair BTC/USDT = buying and selling bitcoin with USDT (a dollar stablecoin). A crypto exchange matches orders 24 hours a day, 7 days a week, with no close.
Market order = taker: fills right away
A market order trades straight against orders already in the book, taking liquidity away. You're a taker, with higher fees and possible slippage.
Limit order = maker: waits in line
A limit order sits in the order book waiting for someone to trade with it, adding liquidity to the market. You're a maker, with lower fees, but if price never gets there it never fills.
The thinner the book, the bigger the slippage
A thinly traded coin has very little at each price level, so a big market order eats its way up level by level and pushes the average price higher. Here the slippage can cost more than the fee.
Key takeaways
- The trading pair BTC/USDT means buying and selling Bitcoin priced in USDT. Crypto markets trade 24 hours a day, 7 days a week.
- A market order is a taker: it fills immediately at a higher fee, and big orders eat up through the levels, causing slippage.
- A limit order resting in the order book is a maker: the price is certain and the fee lower, but it won't fill unless the price gets there.
- Obscure coins have thin order books, so slippage on a big market order can cost more than the fee.
Try it yourself
You can do these exercises in this lesson's interactive simulation:
- Keep "Buy at market" at $10,000: what's the fee? Is the average price higher than the lowest ask of 60,010?
- Switch to "Limit buy": what does the fee become? Where does your order sit in the book?
- Go back to the market order, pick "Small coin: thin book" and raise the amount to $50,000: how many levels did it eat? What's the slippage?
- Switch back to "Major coin: deep book" with the same $50,000: which costs more now, slippage or the fee?
Quiz and explanations
- 1. You market-buy $10,000 of crypto with a 0.1% taker fee. What's the fee?
- Answer: $10.$10,000 × 0.1% = $10.
- 2. You place a limit buy below the current price, then the price keeps rising. What happens?
- Answer: It never fills unless the price falls back to your order price.A limit order only fills at your price or better. If the price doesn't come back, it just keeps waiting.
- 3. What's most likely when you buy with a big market order on a very thin order book?
- Answer: The average fill is well above the lowest ask (big slippage).Each level has very little on it, so a big order has to eat its way up, pushing the average price higher.
Terms in this lesson
- exchange (Exchange): A central marketplace that matches buy and sell orders, such as the NYSE or NASDAQ.
- limit order (Limit Order): An order that only fills at your price or better: the price is guaranteed, the fill isn't.
- liquidity (Liquidity): How many orders are waiting near a price; the deeper the book, the harder it is to move the price.
- maker (Maker): The side that posts a limit order and waits in the order book, adding liquidity, usually for a lower fee.
- market order (Market Order): An order that fills right away at whatever price is available: the fill is guaranteed, the price isn't.
- order book (Order Book): All the buy and sell orders that haven't filled yet, lined up by price.
- slippage (Slippage): The difference between the price you expected and your actual average fill, which happens when a large market order eats through several price levels.
- spread (Spread): The gap between the Ask and the Bid, a hidden cost on every trade.
- taker (Taker): The side that trades against an existing order in the book (such as with a market order), removing liquidity, usually for a higher fee.
- trading pair (Trading Pair): The exchange rate between two assets on an exchange; BTC/USDT means buying and selling Bitcoin priced in USDT.